Delivery and installation Australia wide Delivery and installation Australia wide

Freshwater Place end of trip facility lockers lockin lockers australia 1

back to all projects

Freshwater Place end-of-trip facility

Premium finish

client CPT group

architect Gray Puksand

builder Shape Group

location Melbourne Australia

Refresh, update and expand our current end-of-trip facilities. That was the client brief for the 38-floor office building at Freshwater Place in Melbourne’s busy Southbank precinct.

Our work included 418 PL2 hanging lockers, finished in Laminex ‘Battalion’ and ‘Alaskan’ materials. The chosen locking system was the Gantner Smart Card system, which was integrated with the building's access control. The lockers also featured bench and padded seating and integrated shoe shelves. A feature that required a custom approach was the curved wall. To achieve the perfect fit, we worked closely with the builder to make sure the curved lockers could be installed seamlessly. The bulkheads were also purpose-designed to enable access to services like the lock controls.

The last word should perhaps be left to project architect Gray Puksand – ‘a premium end-of-trip facility’, we couldn’t agree more.

A premium end-of-trip facility